Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /customers/d/c/3/belbridgestructures.co.uk/httpd.www/wp-content/plugins/revslider/includes/operations.class.php on line 2722 Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /customers/d/c/3/belbridgestructures.co.uk/httpd.www/wp-content/plugins/revslider/includes/operations.class.php on line 2726 Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /customers/d/c/3/belbridgestructures.co.uk/httpd.www/wp-content/plugins/revslider/includes/output.class.php on line 3624 40-41 Great Marlborough Street W1 - Belbridge Structures Ltd

40-41 Great Marlborough Street W1

Project: 40-41 Great Marlborough Street W1

Project Description: Extension and refurbishment of 40-41 Great Marlborough Street in Soho

Our Works Included:
-Underpinning
-Installation of temporary works to retain existing building.
-Reduced level dig.
-Installation of foul and storm water drainage.
-Installation of reinforced concrete lower ground floor slab.
-Placing of concrete and reinforcement to metal decking ground floor to 5th floor.