Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /customers/d/c/3/belbridgestructures.co.uk/httpd.www/wp-content/plugins/revslider/includes/operations.class.php on line 2722 Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /customers/d/c/3/belbridgestructures.co.uk/httpd.www/wp-content/plugins/revslider/includes/operations.class.php on line 2726 Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /customers/d/c/3/belbridgestructures.co.uk/httpd.www/wp-content/plugins/revslider/includes/output.class.php on line 3624 210 Kingston Road Teddington TW11 - Belbridge Structures Ltd

210 Kingston Road Teddington TW11

Project: 210 Kingston Road Teddington TW11

Project Description: Construction of ground floor shell for a new retail outlet with a 2 storey structure on top forming 7nr residential units above

Works included :
-Site Clearance.
-Reduce level dig.
-Installation of foul and surface water drainage including attenuation tank.
-Reinforced concrete ground beams.
-Construction of ground floor slab with Fibre Concrete.
-Construction of first floor reinforced concrete slab for CLT frame,