Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /customers/d/c/3/belbridgestructures.co.uk/httpd.www/wp-content/plugins/revslider/includes/operations.class.php on line 2722 Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /customers/d/c/3/belbridgestructures.co.uk/httpd.www/wp-content/plugins/revslider/includes/operations.class.php on line 2726 Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /customers/d/c/3/belbridgestructures.co.uk/httpd.www/wp-content/plugins/revslider/includes/output.class.php on line 3624 131 Mill lane Portslade BN41 2FH - Belbridge Structures Ltd

131 Mill lane Portslade BN41 2FH

Project: 131 Mill lane Portslade BN41 2FH.

Project Description: A redevelopment of the Mill House pub in Portslade into 7 individual 3 bedroom terraced residences with Off-Road Parking and Large Rear Gardens.

Our Works included:

-Construction of reinforced ground beams.
-Blockwork to DPC
-Beam and Block Floor
-Reinforced concrete ground floor slab.
-Installation of foul and storm water drainage including 3.2m Deep Soakaway